Bordo Diamond Mist Drill Water Bottle Swivel Set
Available
Bordo HSS drill bits handle the full range of general workshop and trade drilling in steel, aluminium, and non-ferrous metals. The Diamond Mist Drill Water Bottle Swivel Set - 2712-WBS is part of Bordo's comprehensive Australian cutting tool range — trusted by engineers, tradespeople, and machinists across industry and manufacturing.
Where this product is used
HSS drill bits are the general-purpose workhorse for drilling steel, aluminium, copper, and plastics in workshop and trade environments.
- General purpose drilling in mild steel, aluminium, copper, and wood in workshop and site
- Maintenance and repair drilling across a wide range of materials
- Fabrication, construction, and trade drilling in production and site environments
Selecting the right option
For mild steel and aluminium, standard jobber HSS is appropriate. Black oxide finish improves lubricity; bright finish suits aluminium. Sets covering 1–13mm (25 pieces) or 1–10mm (19 pieces) cover most trade requirements. Replace drills when cutting effort increases — a dull drill work-hardens stainless and hard steels.
Resources
Couldn't load pickup availability
Secure Checkout. We do not store credit card details

